| E129 series | |
|---|---|
![]() Set B5 in February 2017 | |
| Manufacturer | J-TREC |
| Built at | Niitsu |
| Family name | sustina |
| Replaced | 115 series |
| Constructed | 2014–2018, 2022–present |
| Entered service | 6 December 2014 |
| Number built | 176 vehicles (62 sets) |
| Number in service | 172 vehicles (61 sets) (as of 7 March 2022) |
| Formation | 2/4 cars per trainset |
| Fleet numbers | A1–A34, B1–B27 |
| Operators | JR East |
| Depots | Niigata |
| Specifications | |
| Car body construction | Stainless steel |
| Car length | 19.57 m (64 ft 2 in) (end cars) 19.5 m (64 ft)(intermediate cars) |
| Width | 2,950 mm (9 ft 8 in) |
| Height | 3,620 mm (11 ft 11 in) |
| Floor height | 1,130 mm (3 ft 8 in) |
| Doors | 3 pairs per side |
| Maximum speed | 110 km/h (68.4 mph) |
| Traction system | Variable frequency (IGBT) |
| Acceleration | 2.0 km/(h⋅s) (1.2 mph/s) |
| Deceleration | 3.6 km/(h⋅s) (2.2 mph/s) |
| Electric system(s) | 1,500 V DC |
| Current collector(s) | Overhead catenary |
| Bogies | DT71 (motored) TR255 (trailer) |
| Safety system(s) | ATS-P, ATS-Ps |
| Multiple working | E127 series, under emergency conditions |
| Track gauge | 1,067 mm (3 ft 6 in) |
The E129 series (E129系) is a DC electric multiple unit (EMU) train type operated by East Japan Railway Company (JR East) on local services in the Niigata area since 6 December 2014.
Design
Built at the J-TREC factory in Niitsu, Niigata, the stainless steel body and "universal design" interior is derived from the E233 series commuter EMU.[1] Externally, trains are finished in a livery with "golden yellow" (黄金イエロー) and "toki pink" (朱鷺ピンク) stripes.[1] The trains have a maximum speed of 110 km/h (68.4 mph).[1]
Operations

E129 series trains operate on the following lines,[2] completely replacing older 115 series sets by around 2017.[3][4]
- Joetsu Line (Minakami – Miyauchi)
- Shinetsu Main Line (Naoetsu – Niigata)
- Uetsu Main Line (Niitsu – Murakami)
- Hakushin Line (Niigata – Shibata)
- Echigo Line (Kashiwazaki – Niigata)
- Yahiko Line (Higashi-Sanjō – Yahiko)
The E129 series trains can operated in multiple, to form 2+2, 2+4, and 2+2+2 formations, but do not operate in multiple with E127 series trains except in emergencies.[1]
Fleet
As of 8 March 2022, the E129 series fleet consists of 34 two-car sets (68 vehicles) numbered A1 to A34 and 27 four-car sets (108 vehicles) numbered B1 to B27. All sets are based at Niigata Depot.[1]
Formations
2-car sets A1-A32
The two-car sets, A1 to A32, consist of two motored cars, each with one powered bogie, and are formed as shown below.[1]
| Designation | Mc-100 | Mc'-100 |
|---|---|---|
| Numbering | KuMoHa E129-100 | KuMoHa E128-100 |
| Weight (t) | 37.2 | |
| Capacity (total/seated) | 140/50 | 133/46 |
- The KuMoHa E129-100 car is fitted with a PS33G single-arm pantograph (cars KuMoHa E129-123 to KuMoHa E129-130 have two pantographs, and weigh 37.4 t).[1]
- The KuMoHa E128-100 car has a universal access toilet.[1]
4-car sets B1-B26
The four-car sets, B1 to B26, consist of four motored cars, each with one powered bogie, and are formed as shown below.[1]
| Designation | Mc-0 | M'-0 | M-0 | Mc'-0 |
|---|---|---|---|---|
| Numbering | KuMoHa E129 | MoHa E128 | MoHa E129 | KuMoHa E128 |
| Weight (t) | 37.2 | 31.6 | 32.7 | 37.0 |
| Capacity (total/seated) | 140/50 | 154/60 | 133/46 | |
Interior
Passenger accommodation consists of a mix of transverse seating bays and longitudinal bench seating.[1] LED lighting is used throughout.[1] Longitudinal seats have a width of 460 mm (1 ft 6 in) per person, 1 cm (0.39 in) wider than for the earlier E127 series trains, and the seating pitch for transverse seating bays is 540 mm (1 ft 9 in), approximately 11 cm (4.3 in) wider than E233 series trains.[1] Floor height is 1,130 mm (3 ft 8 in), the same as for E127 series trains, and lower than the 1,225 mm (4 ft 0.2 in) floor height of 115 series trains.[1]
Interior view
Longitudinal bench seating
A transverse seating bay
Driver's cab
History
Initial details of the new trains were announced by JR East in July 2013.[3] The first two two-car sets, A1 and A2, were delivered on 8 October 2014, with test-running commencing the same day.[5]
The first trains entered revenue service on 6 December 2014.[6]
Fleet details
As of 31 December 2017, the fleet is as follows.[7]
2-car sets
| Set No. | Date delivered |
|---|---|
| A1 | 17 October 2014 |
| A2 | |
| A3 | |
| A4 | 23 October 2014 |
| A5 | 7 November 2014 |
| A6 | 21 November 2014 |
| A7 | 8 December 2014 |
| A8 | 22 December 2014 |
| A9 | 15 January 2015 |
| A10 | 28 January 2015 |
| A11 | 27 February 2015 |
| A12 | |
| A13 | 20 April 2015 |
| A14 | |
| A15 | 21 May 2015 |
| A16 | |
| A17 | 18 June 2015 |
| A18 | |
| A19 | 16 July 2015 |
| A20 | |
| A21 | 20 August 2015 |
| A22 | |
| A23 | 15 September 2015 |
| A24 | |
| A25 | 16 October 2015 |
| A26 | |
| A27 | 11 November 2015 |
| A28 | |
| A29 | 2 December 2015 |
| A30 | 1 February 2016 |
| A31 | 11 December 2017[8] |
| A32 | 26 December 2017[8] |
| A33 | February 2022[9] |
| A34 | 2022[10] |
4-car sets
| Set No. | Date delivered |
|---|---|
| B1 | 28 January 2016 |
| B2 | 29 January 2016 |
| B3 | 1 February 2016 |
| B4 | 5 February 2016 |
| B5 | 15 February 2016 |
| B6 | 19 February 2016 |
| B7 | 26 February 2016 |
| B8 | 4 March 2016 |
| B9 | 10 March 2016 |
| B10 | 17 March 2016 |
| B11 | 24 March 2016 |
| B12 | 31 March 2016 |
| B13 | 9 June 2016 |
| B14 | 21 June 2016 |
| B15 | 1 July 2016 |
| B16 | 13 July 2016 |
| B17 | 27 July 2016 |
| B18 | 5 August 2016 |
| B19 | 22 August 2016 |
| B20 | 1 September 2016 |
| B21 | 13 September 2016 |
| B22 | 26 September 2016 |
| B23 | 27 January 2017 |
| B24 | 6 February 2017 |
| B25 | 14 February 2017 |
| B26 | 2018 |
| B27 | 2022[10] |
Derivatives
Delivery of three two-car SR1 series (SR1系) sets from J-TREC in Niitsu began in March 2020. They are derived from the E129 series and are scheduled to replace the 115 series currently operated by Shinano Railway.[11] These trains were put into service of rapid trains operated by Shinano Railway starting from 4 July 2020.[12]
SR1 series set S101 in February 2022
SR1 series set S204 in February 2022
References
- 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 Mizutani, Keisuke (January 2015). E129系一般形直流電車 [E129 series DC EMU]. Japan Railfan Magazine (in Japanese). Vol. 55, no. 645. Japan: Koyusha Co., Ltd. pp. 60–66.
- 1 2 通勤形車両の新造計画について [New commuter train manufacture plans] (PDF) (in Japanese). East Japan Railway Company. 2 July 2013. Archived (PDF) from the original on 6 October 2014. Retrieved 21 November 2014.
- ↑ Miki, Kazuya (14 August 2013). 「新潟産」車両、地元に投入 JR東日本のE129系 ["Niigata-built" trains to be introduced locally – JR East E129 series]. The Asahi Shimbun (in Japanese). Japan. Archived from the original on 23 September 2015. Retrieved 29 November 2013.
- ↑ E129系が試運転 [E129 series is test run]. Japan Railfan Magazine Online (in Japanese). Japan: Koyusha Co., Ltd. 9 October 2014. Archived from the original on 9 October 2014. Retrieved 9 October 2014.
- ↑ E129系が営業運転を開始 [E129 series enters revenue service]. Japan Railfan Magazine Online (in Japanese). Japan: Koyusha Co., Ltd. 7 December 2014. Archived from the original on 9 December 2014. Retrieved 9 December 2014.
- ↑ JR電車編成表 2018冬 [JR EMU Formations – Winter 2018] (in Japanese). Japan: Kotsu Shimbunsha. 15 November 2017. pp. 38–39. ISBN 978-4-330-84117-5.
- 1 2 JR車両のうごき [JR rolling stock changes]. Tetsudo Daiya Joho Magazine (in Japanese). Vol. 47, no. 407. Japan: Kotsu Shimbun. March 2018. p. 102.
- ↑ "E129系増備車A33編成が弥彦線で運転開始" [E129 series set A33 begins operation on the Yahiko Line]. Japan Railfan Magazine Online (in Japanese). Japan: Koyusha Co., Ltd. 7 March 2022. Archived from the original on 9 March 2022. Retrieved 9 March 2022.
- 1 2 "E129系B27編成が登場" [E129 series set B27 on test]. Japan Railfan Magazine Online (in Japanese). Koyusha Co., Ltd. 2 March 2022. Archived from the original on 9 March 2022. Retrieved 9 March 2022.
- ↑ "しなの鉄道SR1系が登場" [Shinano Railway SR1 series appeared]. Japan Railfan Magazine Online (in Japanese). Japan: Koyusha Co., Ltd. 27 March 2020. Archived from the original on 4 April 2020. Retrieved 4 April 2020.
- ↑ "しなの鉄道 SR1系 営業運転(2020年7月4日~)". 鉄道コム. 19 June 2020. Archived from the original on 6 July 2020. Retrieved 6 July 2020.
External links
- JR East E129 series (in Japanese)
