Bielefeld Stadtbahn
Overview
LocaleBielefeld, North Rhine-Westphalia, Germany
Transit typeLight rail (Stadtbahn)/Rapid transit
Number of lines4
Number of stations62[1][2]
Annual ridership32.77 million (2012)[1]
WebsitemoBiel
Operation
Began operation1991[2]
Operator(s)moBiel
Number of vehicles76[1][2]
Technical
System length36.9 km (22.9 mi)[1][2]
Track gauge1,000 mm (3 ft 3+3⁄8 in)
Average speed22.6 km/h (14.0 mph)[1][2]
System map

The Bielefeld Stadtbahn is a metre gauge light rail (i.e. Stadtbahn) network in the German city of Bielefeld, North Rhine-Westphalia, Germany. The system does include some segments built to rapid transit standards. It is operated by moBiel, a subsidiary of the Bielefeld municipal authority (Stadtwerke), and integrated in the Westfalentarif transport association. It served 32.77 million passengers in 2012.[1]

History

The old tram (Straßenbahn) network was rebuilt into a three-line Stadtbahn (light rail) network between 1978 and 1991, with the official inauguration of the Stadtbahn in 1991.[2] A fourth line was built to the university area and added to the network in 2002. Until 31st of July 2021 four more supplemental lines were operated, which are now labeled with the normal line numbers. At the 1st of August 2021 the tram lines 3 & 4 changed its destinations. Line 3 ends at Dürkopp Tor 6, Line 4 in Stieghorst.

Operations

Hours of operation and frequencies

Trains run until 1 a.m. every day, with service starting at 4:30 a.m. every weekday, at 6:00 a.m. on Saturdays, and at 8:30 a.m. on Sundays and public holidays. Trains run every 5–10 minutes during the day and at least every 15 minutes late night and Sundays. On weekend nights, there is an hourly service, so there is a proposal for 24-hour service.

Lines

The Bielefeld Stadtbahn is made up of four lines, with a total track length of 66.3 kilometres (41.2 mi).[1][2] The mainline network operates over a total route length of 36.9 kilometres (22.9 mi),[1][2] serving 62 stops,[1][2] of which seven are underground stations.[3]

Line Route
1 Schildesche – Hauptbahnhof – Jahnplatz – Bethel – Brackwede – Senne
2 Altenhagen – Milse – Baumheide – Hauptbahnhof – Jahnplatz – Sieker
3 Babenhausen-Süd – Hauptbahnhof – Jahnplatz – Dürkopp Tor 6
4 Lohmannshof – Universität – Hauptbahnhof – Jahnplatz – Sieker Mitte – Stieghorst

Future service

In 2013 the municipal council decided to build a new Line "5" from the Kunsthalle Bielefeld via Jahnplatz and Kesselbrink to Heepen, with an opening planned for 2019. However, a citizens initiative voted against proceeding with this extension in 2014.[4]

References

Inline references

  1. 1 2 3 4 5 6 7 8 9 "Zahlen & Fakten" [Numbers & Facts] (in German). moBiel. May 2013. Archived from the original on 2017-11-17. Retrieved 2013-10-04.
  2. 1 2 3 4 5 6 7 8 9 "StadtBahn - Immer auf Erfolgsschiene" [StadtBahn - Always on Track to Success] (in German). moBiel. Archived from the original on 2013-10-06. Retrieved 2013-10-04.
  3. ↑ "StadtBahn-Netz - Die Linien der StadtBahn und ihre Umgebung" [Stadtbahn Network - The Lines of the Stadtbahn and Its Environs] (in German). moBiel. Archived from the original on 2017-09-27. Retrieved 2013-10-04.
  4. ↑ "moBiel-Stellungnahme zum »Nein« bei der Bürgerabstimmung zum StadtBahn-Ausbau" [moBiel's opinion on "No" vote when citizens voted on light rail expansion] (in German). moBiel. 27 May 2014. Archived from the original on 29 May 2014. Retrieved 2014-05-28.

Bibliography

  • Schwandl, Robert (2012). Schwandl's Tram Atlas Deutschland (in German and English) (3rd ed.). Berlin: Robert Schwandl Verlag. pp. 14–15. ISBN 9783936573336.



52°02′21″N 8°29′49″E / 52.03917°N 8.49694°E / 52.03917; 8.49694

This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.