| Line 1 | |
|---|---|
![]() | |
![]() Line 1 train leaving Hongzuizi station | |
| Overview | |
| Status | Operational |
| Owner | Changchun |
| Locale | Changchun, Jilin, China |
| Termini |
|
| Stations | 15 |
| Service | |
| Type | Rapid transit |
| System | Changchun Rail Transit |
| Services | 1 |
| Operator(s) | Changchun Rail Transit Corporation |
| History | |
| Opened | 30 June 2017 |
| Technical | |
| Line length | 18.14 km (11.27 mi)[1] |
| Number of tracks | 2 |
| Character | Underground |
| Track gauge | 1,435 mm (4 ft 8+1⁄2 in) |
Line 1 of the Changchun Rail Transit (Chinese: 长春轨道交通1号线; pinyin: Chángchūn Guǐdào Jiāotōng Yī Hào Xiàn) is a rapid transit line running from north to south Changchun. It opened on 30 June 2017. This line is 18.14 km long with 15 stations.[1][2]
Opening timeline
| Segment | Commencement | Length | Station(s) | Name |
|---|---|---|---|---|
| North Ring Road — Hongzuizi | 30 June 2017 | 18.14 km (11.27 mi)[1] | 14 | Phase 1 |
| Changchun Railway Station | 26 January 2019 | infill station | 1 |
Service routes
- North Ring Road — Hongzuizi
Stations
| Station name | Connections | Distance km |
Location | ||||
|---|---|---|---|---|---|---|---|
| English | Chinese | ||||||
| North Ring Road | 北环城路 | 8 | 0.00 | 0.00 | Kuancheng | ||
| Qingfeng Road | 庆丰路 | 1.19 | 1.19 | ||||
| Yikuang Street | 一匡街 | 1.31 | 2.50 | ||||
| Changchun Railway Station (North) | 长春站北 | CJ ~ JH CB ~ BA 4 |
1.12 | 3.62 | |||
| Changchun Railway Station | 长春站 | CJ ~ JH CB ~ BA 3 |
0.75 | 4.37 | |||
| Shengli Park | 胜利公园 | 0.93 | 5.30 | ||||
| Renmin Square | 人民广场 | 1.42 | 6.72 | Chaoyang / Nanguan | |||
| Jiefang Avenue | 解放大路 | 2 | 1.00 | 7.72 | |||
| Northeast Normal University | 东北师大 | 1.57 | 9.29 | ||||
| Gongnong Square | 工农广场 | 1.44 | 10.73 | ||||
| Fanrong Road | 繁荣路 | 1.23 | 11.96 | ||||
| Weixing Square | 卫星广场 | 3 | 0.80 | 12.76 | Nanguan | ||
| Municipal Government | 市政府 | 1.48 | 14.24 | ||||
| Huaqing Road | 华庆路 | 1.09 | 15.33 | ||||
| Hongzuizi | 红嘴子 | 1.08 | 16.41 | ||||
References
- 1 2 3 长春地铁1号线通车试运营. 中国新闻网 (in Chinese). 2017-06-30. Archived from the original on 2019-10-07. Retrieved 2021-11-27.
- ↑ 长春地铁1号线达到试运营评估8个标准要求. 新华网 (in Chinese). 23 May 2017. Retrieved 7 June 2017.
This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.

.jpg.webp)