| Line 5 | |
|---|---|
![]() Guangfulu Xikou station | |
| Overview | |
| Status | In operation |
| Locale | Kunming, Yunnan, China |
| Termini |
|
| Stations | 22 |
| Service | |
| Type | Rapid transit |
| System | Kunming Metro |
| History | |
| Opened | 29 June 2022[1] |
| Technical | |
| Line length | 26.45 km (16.4 mi) |
| Number of tracks | 2 |
| Track gauge | 1,435 mm (4 ft 8+1⁄2 in) |
Line 5 is a rapid transit line of the Kunming Metro, serving the city of Kunming, Yunnan Province, China. The line has a total length of 26.45 km (16.4 mi) and 22 stations.[2] Phase 1 of the line was opened on 29 June 2022.[1]
History
Construction began in June 2016.[3] The line is constructed by a consortium consisting of China Railway Construction Corp, Fourth Railway Research Institute Investment Co, and Kunming Railway Group.
Opening timeline
| Segment | Commencement | Length | Station(s) | Name |
|---|---|---|---|---|
| World Horti-Expo Garden — Baofeng | 29 June 2022[1] | 26.45 km (16.4 mi) | 22 | Phase 1 |
Rolling stock
The line is operated using six-car Type B trainsets produced by CRRC, with a maximum speed of 80 km/h and a capacity for 2094 passengers.[4]
Stations
| Station name | Connections | Distance km |
Location | ||||
|---|---|---|---|---|---|---|---|
| English | Chinese | ||||||
| World Horti-Expo Garden | 世博园 | Panlong | |||||
| Bailongsi | 白龙寺 | ||||||
| Shizha | 石闸 | ||||||
| Chuanjin Road | 穿金路 | ||||||
| North Railway Station | 火车北站 | 2 4 |
|||||
| Yuantong Hill | 圆通山 | Wuhua | |||||
| Huashan West Road | 华山西路 | ||||||
| Wuyi Road | 五一路 | 3 | |||||
| Milesi | 弥勒寺 | 1 | Xishan | ||||
| Yanjiadi | 严家地 | ||||||
| Jinlan Road | 金兰路 | ||||||
| Fuhai | 福海 | ||||||
| Guangfulu Xikou | 广福路西口 | ||||||
| Daba | 大坝 | ||||||
| Yinghai Road | 迎海路 | ||||||
| Yuhucun | 渔户村 | ||||||
| Xingti Road | 兴体路 | ||||||
| Zhuangjiatang Overpass | 庄家塘立交桥 | ||||||
| Jinjia River | 金家河 | ||||||
| Fubao | 福保 | Guandu | |||||
| Dianchi International Convention and Exhibition Center | 滇池国际会展中心 | 2 | |||||
| Baofeng | 宝丰 | 2 | |||||
References
- 1 2 3 "昆明轨道交通5号线29日要开通初期运营了". 2022-06-28. Retrieved 2022-06-28.
- ↑ "昆明地铁5号线空载试运行". 2022-01-16.
- ↑ "昆明地铁5号线最新进展:预计9月底实现轨通". Archived from the original on 2022-07-27.
线路全长26.45公里,全线共设车站22座,总投资228亿元,于2016年6月开工建设
- ↑ "昆明地铁5号线首列车来啦!从试制到生产完全"昆明造"". Archived from the original on 2022-07-27.
列车采用B型车,6节编组,最高运行速度80km/h,最大载客量2094人
This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.
