Tecolote Road
Tecolote Road station platform
General information
Location1364 West Morena Boulevard
San Diego, California
Coordinates 32°46′11″N 117°12′18″W / 32.7698°N 117.2051°W / 32.7698; -117.2051
Owned bySan Diego Metropolitan Transit System
Operated bySan Diego Trolley
Platforms2 side platforms
Tracks2
Construction
Structure typeAt-grade
Parking279 spaces[1]
Bicycle facilities4 lockers[2]
AccessibleDisabled access
Other information
Station code77770, 77771[3]
History
OpenedNovember 21, 2021 (2021-11-21)[4]
Services
Preceding station San Diego Trolley Following station
Clairemont Drive
towards UTC
Blue Line Old Town
towards San Ysidro
Location

Tecolote Road station is a San Diego Trolley station in San Diego, California. The station is located adjacent to the 5 Freeway/Tecolote Road interchange.[5] It was developed as a station for the Mid-Coast Trolley extension project, which is an extension for the Blue Line.[6][7] The station has 279 parking spaces.[8][9][10]

Station layout

There are two tracks, each served by a side platform.

Side platform, doors will open on the right
Northbound ← Blue Line toward UTC (Clairemont Drive)
Southbound → Blue Line toward San Ysidro (Old Town) →
Side platform, doors will open on the right

References

  1. ↑ "Transit Station Parking". San Diego Metropolitan Transit System. July 27, 2015. Retrieved August 20, 2022.
  2. ↑ "Interactive San Diego Regional Bike Map". San Diego Association of Governments (SANDAG). Retrieved August 20, 2022.
  3. ↑ "Schedules & Real Time". San Diego Metropolitan Transit System. Retrieved November 21, 2021.
  4. ↑ Olsen, Mark (November 22, 2021). "San Diego Region Celebrates Grand Opening of Mid-Coast Extension of the UC San Diego Blue Line Trolley" (Press release). San Diego Metropolitan Transit System. Retrieved October 24, 2022.
  5. ↑ "Old Town Transit Center to north of Tecolote Road Station". San Diego Association of Governments (SANDAG). keepsandiegomoving.com. Retrieved June 18, 2020.
  6. ↑ Mid-coast Corridor Project, San Diego, California: Final Environmental Impact Statement (Final EIS). The Administration. 2001. pp. 2–.
  7. ↑ "Mid-Coast Trolley". www.keepsandiegomoving.com. Retrieved November 23, 2019.
  8. ↑ Mid-Coast Trolley Extension Route Flyover (Video). San Diego Association of Governments (SANDAG). March 15, 2017. Retrieved November 23, 2019.
  9. ↑ Bowen, Andrew. "Planning Commission Advances Trolley Station Development Plan". KPBS Public Media. Retrieved November 24, 2019.
  10. ↑ "Will new trolley stops bring unwelcomed skyscrapers and other development?". The San Diego Union-Tribune. September 20, 2017. Retrieved November 24, 2019.

Media related to Tecolote Road station at Wikimedia Commons


This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.