| Yangcheng Power Station 阳城电厂 | |
|---|---|
| Country | China | 
| Location | Shanxi | 
| Coordinates | 35°28′01″N 112°34′21″E / 35.46694°N 112.57250°E | 
| Status | Operational | 
| Construction began | 2002 | 
| Commission date | 1996 | 
| Owner(s) | Datang International Power Generation Company[1] | 
| Thermal power station | |
| Primary fuel | Coal | 
| Power generation | |
| Units operational | 6 x 350 MW, 2 x 600 MW | 
| Nameplate capacity | 3,300 MW | 
Yangcheng Power Station (Chinese: 阳城电厂) is a coal-fired power station in Beiliu, Shanxi, China. It has an installed capacity of 3,300 MW. The plant was first commissioned in 1996.[2] Construction on phase one of the plant began in 2001 and ended in 2007.[1] The plant is the site of the world's two largest dry cooling towers.[3]
See also
References
- 1 2 "Yangcheng power station - Global Energy Monitor". Retrieved 2021-01-02.
- ↑ "Yangcheng Coal-Fired Power Plant, Shanxi Province - Power Technology". Retrieved 2021-01-02.
- ↑ "Yangcheng Coal-Fired Power Plant" (PDF). 2018-06-11. Retrieved 2021-01-02.
    This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.